3 67565 ESTIMATE FOR BILL OF QUANTITY :-DESIGN, CONSTRUCTION, SUPPLY, TESTING, COMMISSIONING OF WATER SUPPLY SCHEMES WITH ELECTRIC DRIVEN PUMPS AND FLUORIDE TREATMENT PLANT HAVING TECHNOLOGY (ADSORPTION/NANO TECHNOLOGY) BY CSIR OR CERTIFIED BY CSIR OR ANY OTHER TECHNOLOGY ENDORSED/ APPROVED BY GOI. CONSTRUCTION OF WATER SUPPLY SCHEMES IN THIS FLUORIDE AFFECTED HABITATIONS/WARDS OF BANKA DISTRICT OF BIHAR WILL BE ON TURN KEY BASIS WITH 06 MONTH TRIAL RUN AFTER COMMISSIONING AND COMPREHENSIVE OPERATION AND MAINTENANACE OF 60 MONTHS UNDER MUKHYAMANTRI PEYJAL NISCHAY YOJANA (QUALITY AFFECTED) UNDER P.H.DIVISION BANKA, WARD NO- 16B (SIFLIYA RAMJI TOLA), 13B (KUDALKHUT), 2A (DUDHIJOR), 2B (TERIYA), PANCHAYAT- BHORSAR BHELWA, BLOCK- KATORIA (04 NO SCHEME) FOR YEAR 2023-24.(GR NO-01) NIT No.-RE-TENDER NIT NO-08/2024-25/(MBF) GR NO 01 Public Health Engineering Department 2024-08-14 17:00 00:04:36
საქონლის/მომსახურებების მოწოდების გეგმა
ჩვენ მაქსიმალურად ვცდილობთ, რომ ჩვენს ვებ-კვანძზე განთავსებული ინფორმაცია იყოს ზუსტი და განახლებული, ამავე დროს არ ვიძლევით გარანტიას, რომ მოცემული ინფორმაცია დაზღვეულია შეცდომებისაგან.
თუ თქვენ გაქვთ რაიმე შემოთავაზება ამ განაცხადის განახლებასთან/შესწორებასთან დაკავშირებით, გთხოვთ შეგვატყობინოთ.